Sydney, Sep. 28, 2026 - Hitachi Energy, a global leader in electrification, today marked the final commercial operations at the Waratah Super Battery, a major milestone for one of the world’s most powerful battery energy storage systems and a landmark energy infrastructure project for New South Wales.
The Waratah Super Battery is designed to deliver 850 megawatts (MW) of power and store 1,680 megawatt hours (MWh) of energy. The project was commissioned and overseen by EnergyCo and the NSW Government and is built, owned, and operated by Akaysha Energy.
It’s Australia’s most powerful battery system, which is also wired into the country’s most innovative and largest monitoring and control system known as the System Integrity Protection Scheme (SIPS), operated by Transmission Network Service Provider Transgrid.
It means the battery can charge and discharge energy to the grid when needed and also acts as a giant shock absorber by detecting grid disturbances in milliseconds and triggering a battery response to maintain system reliability.
Hitachi Energy supplied, installed, and commissioned 288 power conversion systems and two power plant controllers for the project, creating the digital architecture that orchestrates the battery’s real-time response.
Real-time monitoring, diagnostics, and advanced analytics from HMAX™ Energy, Hitachi’s AI-powered suite of service solutions for critical energy infrastructure delivered through a 20-year service agreement, will also provide continuous visibility of system performance to plan, predict, and prevent issues before they occur.
This enables proactive maintenance, optimized dispatch strategies, and faster identification of potential issues before they impact operations.