Choose your region and language

Global
Argentina
Australia
Austria
Bahrain
Brazil
Bulgaria
Canada
Chile
China
Colombia
Czech Republik
Denmark
Egypt and North Africa
Finland
France
Germany
Greece
Hungary
India
Indonesia
Iraq
Ireland
Italy
Japan
Jordan
Kuwait
Malaysia
Mexico
New Zealand
Norway
Oman
Pakistan
Panama
Peru
Philippines
Poland
Portugal
Qatar
Saudi Arabia
Singapore
Slovakia
South Africa
South Korea
Spain
Sweden
Switzerland
Taiwan, China
Thailand
Türkiye
Ukraine
United Arab Emirates
United Kingdom
United States
Vietnam
English
Spanish
English
German
English
Portuguese
English
English
French
Spanish
Chinese
Spanish
English
English
English
English
French
German
English
English
English
English
English
English
Italian
Japanese
English
English
English
Spanish
English
English
English
English
Spanish
Spanish
English
Polish
English
English
English
English
English
English
English
Spanish
Swedish
German
French
Italian
English
English
English
English
English
English
English
English
Go

Menu

ABB Power Grids supports China to build multi-terminal power transmission projects

Press Release | Beijing, China | 15.06.2020 | 3 min read

Partnering with China Southern Power Grid to deliver clean power from west to east China

On June 11, the Yunnan-Guizhou ±500 kilovolt (kV) direct current (DC) transmission line was officially put into operation. As the world’s first ±500 kV three-terminal power project developed by China Southern Power Grid (CSG) in south China, the line will effectively increase the hydropower consumption in Yunnan Province, southwest China and deliver more clean electricity to Guangdong Province in southeast China. 

ABB Power Grids provided leading high-voltage (HV) technologies for the newly constructed Luquan converter station in Yunnan Province to ensure safe and reliable power supply. 

The Yunnan-Guizhou transmission line is China’s first “three-terminal” DC power project that transformed from a “two-terminal” DC transmission line. It added a converter station in Luquan, Yunnan, connected with the established Guizhou-Guangdong DC transmission line and achieved the three-terminal DC transmission link across Yunnan, Guizhou and Guangdong provinces. It is expected to transmit around 6 billion kWh of hydropower every year and reduce coal consumption by 1.8 million tons and carbon dioxide (CO2) emissions by about 4.8 million tons. 

Although facing the challenging schedule, ABB Power Grids supplied 500 kV gas-insulated switchgear (GIS) and gas-insulated line (GIL) to the project in 5 months, and overcame the situation of COVID-19, successfully completing the on-site installation and commission.  

All news