Challenge
Solution
Hitachi Energy’s HVDC Ligth®
converter stations
Two HVDC Light® converter stations, Blackhillock: 1,200 MW, Spittal: 800 MW
Symmetric monopole ±320 kVdc
Submarine and underground cable transmission of nearly 160 kilometers
Impact
Strengthening and stabilizing power grids
Enable integration of renewable energy
Increased network stability
CMS HVDC Link No. 2 - The first regional DC Grid in Europe
Challenge
Solution
First multi-terminal HVDC interconnection in Europe, with option of two more terminals
Kergord: 600 MW ±320 kV